Harnaut - Setting up of workshop to undertake periodical overhauling of up to 50 coaches
|
SN |
Project Parameter |
Status /Remarks |
|
1 |
Pink Book Item |
Original: 340/2003-04/ECR. |
|
2 |
Sanctioned Cost |
|
|
3 |
Location |
Harnaut (next to Bakhtiyarpur station - distance 8 km) District – Nalanda on Bakhtiyarpur - Rajgir (Tilaiya) Rly line of Danapur Division, ECR. |
|
4 |
Outlay in year 17-18 |
Rs.11.78 crore (PH-42 CAP). |
|
5 |
Exp upto Mar’ 18 in year 17-18 |
Rs.4.12 crore (approx.) – PH-42 |
|
6 |
Cumulative Exp. Upto Mar'18 |
Rs.334.66 crore (101.92%) – PH-42 |
|
7 |
Target |
March, 2018. |
|
8 |
Consultancy |
M/s RITES were awarded consultancy contract at a total cost of Rs.1.1 crore for planning, preparation of detailed estimate, detailed design, detailed drawings and preparation of tender documents for Civil, Electrical, S&T and IT portions for workshop only. |
|
9 |
Land |
|
|
10 |
Electrical Load |
Electrical supply – 33/11KV, Total connected load – 7.8 MVA, Maximum demand – 5 MVA |
|
11 |
Capacity |
POH of 600 Non-AC ICF design Coaches per annum. |
|
12 |
Scope of work |
Carriage Repair Workshop comprising of Carriage Repair Shop (220mx30m), Bogie Repair Shop (100mx15m), Sheet Metal Shop (75mx25m), Roller Bearing Shop (20mx60m), Wheel Shop (60mx20m), Paint Shop (160mx20m), Outgoing Shop(80mx15m) and Officers Colony (14 Qtrs) & Staff Colony (380 Qtrs.) |
|
13 |
Project completion status |
|

Accessibility Controls